Just finished the Main Deck Gratings. I had forgot to consider the Deck slope so I ended up forcing the Gratings open.

Just finished the Main Deck Gratings. I had forgot to consider the Deck slope so I ended up forcing the Gratings open.
I started making the Deck House as I waited for a few items to arrive that I ordered.
3) Glue the 3 gratings surrounded with live strip 23 and the stands 24 for the lifeboat. Glue under the stands 2 pieces of strip 2×4 mm.
It’s interesting how the instructions don’t tell you to refer to a certain number, which you would assume to be Figure 3. However, this Diagram doesn’t contain Figure 3 and has Figure 4 instead for the Gratings and Lifeboat Stands. It was confusing.