
This #2 Strake feels more like a Garboard Strake.


This #2 Strake feels more like a Garboard Strake.





I took the wood down the entire length of the False Keel where the Keel is glued to…

Gluing the Keel in..
The Clamping is the reason I put those Holes in the False Keel…


Installing the Stern Post. That’s where the Anchor Gudgeons will fasten on to…

Attaching Stern Post…

I had to add another Cheater between #10 and #12.

Also I didn’t taper the Starboard side Strake coming back to the Transom to even it out with the Port side, which I tapered to 4.5mm.



I couldn’t figure out how else I was going to hold the Plank in so I used Paper Clips as remedial Clamps.

I used my Hot Iron for this bend but it really didn’t need it since it was soaked overnight!!! 🙄🤔🤣

I am now going to use Contact Cement on the Bow.


I couldn’t find a convenient way to hold these Planks to form them on the Transom so I utilized a couple of Bamboo Sticks with Rubber Band to hold it.

I almost used my Steam Iron to help bend it but I found I could bend it without heat. It only broke a little…

Easy to repair that crack.
What I was most worried about was the hard bending as it goes around the Bulkheads. But it seemed to have turned out okay… .. 🙄🤔👍


This Rubber Band Vise is coming in handy… 🤔🙄👍
I’m thinking I might need another Cheater??? 🤔🙄

This is the #9 Strake Bow portion. I went from 16cm out from center to center at 2.85mm.
All in all, this was an easy Steaks except for the Stern portion which was a monster! ..




I added those Holes to provide anchor points for Vises.

I am going to Taper the 5mm Plank from the middle out to 16cm each side. I then run the taper in so that the center width is 2.85mm



I had to make some Cheaters for the #7 Strake because the bend at the last Stern Bulkhead became too severe.

#7 has become a Cheater and there is 1 less Plank. So I guess I’ll have to take that into account for future Plank measurements. 🤔🙄

Above includes the #7 Plank that becomes a Cheater and the next Plank down is #8.
After this whole thing is dry, I am going to do a Cut-out along the last Bulkhead so the Planks will tuck in under the Rudder Plate. .. which I haven’t installed yet.

I have an idea about how to do the #8 Strake going to the Bow. I will Pre-Taper it from 16cm from Center from 5mm to 2.85mm


I probably have to figure out a way to make a Base for the Vise… This will “Do” for now… 🤔🙄😲


Some more of the same really…




I was looking at the Bow and it appears time for a Cheater.

I am Tapering from #3 Bulkhead to the Prow from 5mm down to ~ 2.85mm > Which equates to 14 Planks to fit in a space of 40mm at the Bow.
The 14 Planks come from 70mm from either the Keel to the Temporary Batten OR 70mm from the bottom of the straight Planks that have no Tapering.
